Your ladder/gardens kitchen - Harringay online2024-03-28T11:25:08Zhttps://harringayonline.com/forum/topics/your-ladder-gardens-kitchen?commentId=844301%3AComment%3A770569&feed=yes&xn_auth=noThese things are never straig…tag:harringayonline.com,2015-07-10:844301:Comment:7705692015-07-10T15:22:01.693ZSGhttps://harringayonline.com/profile/SarahGriffiths768
These things are never straightforward are they, but sounds like a great end result. Thanks for sharing David. Will check out radek as he sounds like he couldn't come more highly recommended.
These things are never straightforward are they, but sounds like a great end result. Thanks for sharing David. Will check out radek as he sounds like he couldn't come more highly recommended. Hi, kitchen work completed ne…tag:harringayonline.com,2015-07-10:844301:Comment:7703662015-07-10T13:46:49.173ZDavid Thomashttps://harringayonline.com/profile/DavidThomas
Hi, kitchen work completed nearly on time, delay was worktops not the builder ( radek - more about him and his team later).<br />
The planned work went ahead very rapidly with sometimes 6 guys on site and over 17 tons of material taken out! But, as is so often the case with these houses, the work revealed new problems. The floor was rebuilt from the soil up ( brick piers and timber with lots of ventilation duly approved by building inspector as were the gallows brackets after removal of the chimney…
Hi, kitchen work completed nearly on time, delay was worktops not the builder ( radek - more about him and his team later).<br />
The planned work went ahead very rapidly with sometimes 6 guys on site and over 17 tons of material taken out! But, as is so often the case with these houses, the work revealed new problems. The floor was rebuilt from the soil up ( brick piers and timber with lots of ventilation duly approved by building inspector as were the gallows brackets after removal of the chimney breast). Removal of the ceiling prior to replastering / light and extraction installation revealed joists that needed replacing. With a new floor ,new ceiling and walls taken back and re plastered, a door that became a window and a window that became doubl doors, there was a lot of work before we even started fitting the units and worktops. Even so the work was completed within seven weeks and Goan excellent standard.<br />
Yes , it generated a lot of mess and dust but the team did there best to minimise it but careful planning / moving/ covering in advance is essential.<br />
The work was carried out by Radek Tober and his team who work to exacting standards, we also utilised his link with Klynstone for flooring, units and wonderful worktop.<br />
Radek Canberra contacted on:<br />
Radoslaw Tober : 07912891266<br />
I'll try to insert some before and after pic's tho' I think Radek may already have them in his Facebook gallery! Couldn't possibly recommend o…tag:harringayonline.com,2015-07-10:844301:Comment:7705522015-07-10T12:32:36.748ZMavic Starfishhttps://harringayonline.com/profile/WestGreen
<p>Couldn't possibly recommend our builder as he didn't finish the job. The one bit of advice I would give is get a schedule and pay them in quarterly installments, no additional money till each quarter is done. Luckily I stuck to this advice - ironically from the same guy who initially did the plans, then got the build job - and when he asked for an early payment of last installment I just said no. At which point he lost interest. Managed to find someone else to finish off although most of…</p>
<p>Couldn't possibly recommend our builder as he didn't finish the job. The one bit of advice I would give is get a schedule and pay them in quarterly installments, no additional money till each quarter is done. Luckily I stuck to this advice - ironically from the same guy who initially did the plans, then got the build job - and when he asked for an early payment of last installment I just said no. At which point he lost interest. Managed to find someone else to finish off although most of it had been done, and all the regulations passed by the council. Just very annoying, and double the initial 12 week schedule. Still well worth doing but I guess you pay for what you get, especially if they are competent and have good reviews. Good luck, I'm sure there is another thread somewhere with advice on the same question</p> lovely thanks. I know this co…tag:harringayonline.com,2015-07-10:844301:Comment:7703552015-07-10T10:59:01.933ZSGhttps://harringayonline.com/profile/SarahGriffiths768
lovely thanks. I know this company as I used to live in Earlsfield. Was hoping to use someone more local for our work, so if you have any recommendations...
lovely thanks. I know this company as I used to live in Earlsfield. Was hoping to use someone more local for our work, so if you have any recommendations... This webiste has a great gall…tag:harringayonline.com,2015-07-10:844301:Comment:7700412015-07-10T09:30:50.093ZMavic Starfishhttps://harringayonline.com/profile/WestGreen
<p>This webiste has a great gallery, I just used one of the photos as a guide for our builder </p>
<p><a href="http://www.londonkitchenextensions.co.uk/gallery.htm" target="_blank">http://www.londonkitchenextensions.co.uk/gallery.htm</a></p>
<p>This webiste has a great gallery, I just used one of the photos as a guide for our builder </p>
<p><a href="http://www.londonkitchenextensions.co.uk/gallery.htm" target="_blank">http://www.londonkitchenextensions.co.uk/gallery.htm</a></p> How did the work go David? We…tag:harringayonline.com,2015-07-10:844301:Comment:7701322015-07-10T08:56:12.417ZSGhttps://harringayonline.com/profile/SarahGriffiths768
How did the work go David? We are considering knocking through the utility/downstairs loo and boiler cupboard to open up the kitchen so we can see the garden. Interested to know if yours all went to plan, on time and ended up as per your initial cost expectations.... And if you would recommend your team.. Thanks
How did the work go David? We are considering knocking through the utility/downstairs loo and boiler cupboard to open up the kitchen so we can see the garden. Interested to know if yours all went to plan, on time and ended up as per your initial cost expectations.... And if you would recommend your team.. Thanks Thanks Hugh, you're absolutel…tag:harringayonline.com,2015-04-22:844301:Comment:7449542015-04-22T08:18:19.119ZDavid Thomashttps://harringayonline.com/profile/DavidThomas
Thanks Hugh, you're absolutely right - having enough nightmares about it all as it is so definitely want the " seal of approval" from building inspectors. Fortunately Radek the builder is equally keen
Thanks Hugh, you're absolutely right - having enough nightmares about it all as it is so definitely want the " seal of approval" from building inspectors. Fortunately Radek the builder is equally keen Definitely don't consider lea…tag:harringayonline.com,2015-04-22:844301:Comment:7448242015-04-22T07:57:24.886ZHughhttps://harringayonline.com/profile/hjuk
<p>Definitely don't consider leaving the chimney breast supported in a way that doesn't comply with building regs. It will cause an issue when you come to sell.</p>
<p>We just dealt with a chimney stack removal in a property we bought in Enfield. In that borough you can use gallow brackets in a terraced house as long as the full stack is still in place in the neighbouring house. </p>
<p>Definitely don't consider leaving the chimney breast supported in a way that doesn't comply with building regs. It will cause an issue when you come to sell.</p>
<p>We just dealt with a chimney stack removal in a property we bought in Enfield. In that borough you can use gallow brackets in a terraced house as long as the full stack is still in place in the neighbouring house. </p> Ouch! Will mention this to Ra…tag:harringayonline.com,2015-04-22:844301:Comment:7448202015-04-22T06:35:13.120ZDavid Thomashttps://harringayonline.com/profile/DavidThomas
Ouch! Will mention this to Radek ( builder) this morning! He seems to be aware of local building regs / controls tough they evolve frequently. Hope to god it doesn't take that long, my alternative plan was to open it up as you have and put the hob / extractor there. Thanks for heads up Michael.
Ouch! Will mention this to Radek ( builder) this morning! He seems to be aware of local building regs / controls tough they evolve frequently. Hope to god it doesn't take that long, my alternative plan was to open it up as you have and put the hob / extractor there. Thanks for heads up Michael. David, we had work that sound…tag:harringayonline.com,2015-04-22:844301:Comment:7447322015-04-22T04:57:17.208ZMichael Andersonhttps://harringayonline.com/profile/17bathgate
David, we had work that sounds very similar to yours carried out last year. All went well until it came to taking out the chimney breast. The builder had wanted to put in gallows brackets to support the chimney breast in the room above but Haringey Building Control wouldn't agree to this as it doesn't comply with current London building regulations. Instead they wanted a massive support beam installed across the width of the kitchen. In the end we left the chimney breast as is and had the old…
David, we had work that sounds very similar to yours carried out last year. All went well until it came to taking out the chimney breast. The builder had wanted to put in gallows brackets to support the chimney breast in the room above but Haringey Building Control wouldn't agree to this as it doesn't comply with current London building regulations. Instead they wanted a massive support beam installed across the width of the kitchen. In the end we left the chimney breast as is and had the old fireplace opened up which gave us a large shelving area.<br/>
The whole thing took 3 months and the cost was similar to yours.